Dansk English I Energi sektor Industrien Embedded Systems 
   

 
 
Tower transport
What do you do with a 40 m long, 80 t heavy and Ø4 m tower section, when the bridge clearance is only 4,2 m?
[more]
Blade Production Equipment
FEM calculation and dimensioning of equipment for blade production (Wind turbine)
[more]