   Sea fastening for Caisson  

Esbjerg Oilfield Services A/S (2 entries)
Valdemar BA project

Sea fastening for a Caisson for the Valdemar BA project was developed by HCPe. The caisson must be located at the same Barge, which must be used for the Topside and Jacket for Valdemar BA. (see project Sea fastening for Jacket) [more]

   Sea fastening for Jacket  

Esbjerg Oilfield Services A/S (2 entries)
Valdemar BA project

The Jacket for the Valdemar BA project will be transported to the location offshore by a barge. HCPe has developed a Sea fastening construction for the transport operation and for the load out (from quay to the barge). The sea fastening must be made for all three legs of the Jacket and must be placed below the mud boxes. [more]

   Shaker House  

Mærsk Contractors (21 entries)
Endeavour

The shale shaker house must be rebuilt on Maersk Endeavour. The shaker house consists of a welded-up steel structure in two levels with a storage area on the top level. [more]

   Shoes for derrick  Angola

KCA Deutag UK (2 entries)
Innovation offshore

Drilling a new well is not always easy, when the structure of the rig is not prepared for the load of a new derrick. [more]

   Deck extension  

KCA Deutag UK (2 entries)
Offshore

Project performed for KCA Deutag UK. Drilling Barge Deck was to be extended. The task was to design a new deck according to the demands, safely carried by existing structure. In addition the mounting procedure had to be considered and planned. HCP engineering carried out the task all the way from concept, design, calculations, technical design, through documentation and installationmanuals. [more]

   Enhancer vent  

Mærsk Contractors (21 entries)
Small project scope

In conjunction with every project, work needs to be done that would be considered minor. But even those projects are important. Even ventilation on a rig has to work. Below some examples. [more]

   BOP platform  DK

Mærsk Contractors (21 entries)
Small equipment scope

Design, calculation, fabrication drawings and manuals for a BOP platform [more]

   New Rails for Roughneck  DK

Mærsk Contractors (21 entries)
Offshore Spare Parts

Spare parts made in Denmark? A good alternative' We have experienced that new designed and fabricated spare parts can be up to 60% cheaper hand the original spareparts. Furthermore the parts can be designed stronger! [more]

   Osis Sensor Mount  DK

Osis International (1 entries)
Mounting system for Sensor

Development, calculation, design and documentation of mounting system for Osis Sensor, incl. 4way adjustability, gangway, clampsystem and cableguide. [more]

   Offshore Accomodation B  DK

Mærsk Contractors (21 entries)
Maersk Enhancer

Development and design of Maersk Enhancer offshore accomodation. Incl. coffeeshops, stairtowers, gangway. Incl. calculation of deck and stability. [more]

   Offshore Accomodation A  DK

Mærsk Contractors (21 entries)
Maersk Enhancer

Maersk Enhancer must be converted to at drilling rig again. In connection whit this rebuild project, must a part of the existing accommodation be modified and a new accommodation parts must be added to the rig. [more]

   Maersk Explorer Piping  DK

Mærsk Contractors (21 entries)
New piping on rig

At rig ”Maersk Explorer” currently scheduled at the Caspian Sea, a well test had to be run. To be able to carry out this operation, piping had to be constructed from Well Test Area to Burnerbooms. [more]

   Maersk Guardian Rebuild  DK

Mærsk Contractors (21 entries)
Maersk Guardian

HCP engineering A/S played a key role in a larger rebuild project of Maersk Guardian, which is owned and operated by Maersk Contractors A/S. [more]

   Stairs within an old hatch  DK

Mærsk Contractors (21 entries)
Small structure and equipment scope

Stairs Design of stairs within existing hatch. Idea, concept, development and fabrication drawings by HCP engineering. The stairs are approved by DNV. [more]

   Redesign of foundation for anchor winch  DK

Mærsk Contractors (21 entries)
Small structure and equipment scope

Foundation for anchor winch Design and calculation of foundation for existing anchor winch. Evaluation of the placement on the rig structure. [more]

   Redesign of boom rest support  DK

Mærsk Contractors (21 entries)
Small structure and equipment scope

Boom rest support Re-design and re-drawing of boom rest support. A new set of fabrication drawings was made [more]

   Extension of existing MOB landing  DK

Mærsk Olie & Gas (2 entries)
Deck extensions

MOB landing Extension of existing deck developed, designed and calculated by HCP engineering A/S. Design approved by DNV. Water tank equipped with brake. [more]

   New design of landing  DK

Mærsk Olie & Gas (2 entries)
Deck extensions

Landing (with basket) Design of a platform on an existing deck with very little space. The new platform was developed, designed, calculated and drawn by HCP engineering A/S and approved by DNV. [more]

   Improved mudflow system  DK

Mærsk Contractors (21 entries)
Offshore projects

Mudflow System Design of a new mud flow system with more capacity and variable length. [more]

   Hatch for 10 ft. container  DK

Mærsk Contractors (21 entries)
Offshore projects

Hatch Design and calculation of a specialized hatch by HCP engineering A/S. The design was approved by DNV. [more]

   Innovative design of container for power unit  DK

Mærsk Contractors (21 entries)
Innovation at sea

HP unit container HCP engineering developed, calculated, designed and documented the new container. An installation manual was made also. The container provided significant noise reduction. [more]

   Innovative design of Crane for moonpool area  DK

Mærsk Contractors (21 entries)
Innovation af sea

Crane for moonpool area Idea, development, calculation and design by HCP engineering. Approved by Lloyds Register. Fully documented, including installation manuals. Complete project documentation and installation supervision. [more]

   Innovative design of fingerboard  DK

Mærsk Contractors (21 entries)
Innovation at sea

HCP engineering developed, designed and calculated a new innovative system, which was approved by Lloyds Register. Documentation and manuals were made for fabrication and installation. The system is protected by HCP engineering A/S. [more]

   BOP handling  DK

Mærsk Contractors (21 entries)
Maersk Giant Projects

A new BOP Computerbased 3D clash analysis carried out prior to mounting. Complete report with documentation of necessary changes. [more]

   Reinforcement of drillfloor  DK

Mærsk Contractors (21 entries)
Maersk Giant Projects

Calculation and practical planning of reinforcement. [more]

   Documentation of existing cantilever  DK

Mærsk Contractors (21 entries)
Maersk Giant Projects

The cantilever structure was surveyed and documented by HCP engineering. [more]

   New design of Moonpool foldable deck  DK

Mærsk Contractors (21 entries)
Maersk Giant Projects

Through 3D models and photo series, HCP engineering prepared the installation with a practical approach. To us nothing is accidental - success needs planning. [more]

   Derrick Calculation  DK

Mærsk Contractors (21 entries)
Derrick Calculation

Complete calculation on an existing derrick, combined with the placing of new equipment [more]